Main office
Main office
+41 61 826 86 86
info

Bobsleigh track, China

Häring supplied the roof structure for the bobsleigh complex at the 2022 Winter Olympics in China via its factory in Tianjin. It was made from a combination of steel and timber. Supports in the form of double glulam beams connected to a steel frame were manufactured by Häring in Tianjin. The engineering team from Switzerland was in charge of production and also helped with planning and the production drawings. A total volume of 971m3 glulam was used for the overal.

Client MCC
Häring Swiss Wood Structures Tianjin Ltd
Architect China Architecture Design & Research Group
BMEDI
Planungsbüro Deyle GmbH + Ecosign
Mountain Resort Planners Ltd